THE CHALLENGES

Construction of King Abdullah Center for Oncology and Liver Diseases. Scope of Work includes; Preparation of Shop Drawing, Procurement & Delivery of Construction Materials and Testing and Commissioning of this Project.

PROJECT DESCRIPTION

KACOLD is mainly a Tower building consisting of 23 floors (21 + 2 Basement levels). Total built-up area of the Tower is 83,750 M2. The project will also include a connecting bridge between the new Tower and the existing North Tower at levels 2 and 3. Central Plant Bldg. consists of (5) floors including two (2) Mezzanine floors. Total gross area of the Central Plant building equals to 12,630 M2. The building will house the electromechanical utilities such as Power Generators, Chillers, and other major equipments. Service Tunnel to be constructed under this project is 514 Linear Meters long and will connect the Central Plant with KACOLD with a provision for other future hospital expansions. The tunnel will house all electromechanical utilities. Underground Parking A The building will be of a total built-up area equal to 18,000 M2, and will accommodate 422 cars. Annex Bldg. The building will house 146 cars and will be of a total area equal to 9,180 M2.

CONSTRUCTION PROJECTS

PROJECT DETAILS

Categories:
Client: King Faisal Hospital & Research Center
Location: PO BOX 3354 RIYADH 11211, Kingdom of Saudi Arabia
Surface Area: 3000 SQM
Completed: 95%
Value: 1B SR
Architect: CANNON Design USA