Technical Details
- Full interior refurbishment works of existing Terminals 1 and 2 FOH areas, including a new metro hall to optimize the passenger’s experience. Works to be completed before the start of the G20 summit without interruption of operation.
- Conversion of Terminals 1 and 2 into domestic Terminals after the G20 summit.
- Refurbished Area: 60,000 m² 3 floors and Mezzanine level
- Existing Steel building
- New metro hall